WELLWORD
AND DRILLING. |
Hidrotécnica de La Península S.A. it offers the services of construction of deep wells which includes/understands the following stages: 1.
Transaction of the permissions for the governmental authorization
to make the perforation. 1. Transaction of the permissions for the governmental authorization to make the perforation. This it includes the inspection of the site where it is tried to make the well, in order to determine by means of studies as of the sites he is ideal to carry out the perforation, with the security to reach an underground water source. The request for the perforation granting makes the geologist, professional properly credited by the School of Geologists of Costa Rica for this act. Simultaneously, one becomes the one in charge to control the construction of the well, as it establishes the law. The honoraria of the geologist represent a 9% of the cost by the construction of the well, according to establishes the No.9 article, regulation of Colegio de Geólogos de Costa Rica, by concept of supervision during the accomplishment of the well. In order to present the request of perforation permission the following documentation is due to present:
1. Form of permission and perforation of the subsoil of MINAE.
In the construction of the deep well it takes the following stages: 1.
Provision and preparation of pipe of PVC. Note: 3. Accomplishment of a test of pumping to determine the maximum volume of water production of the well. It is the accomplishment of a test of pumping with submersible equipment for the evaluation of the volume and yield of the well, by a time of 24 hours. 4.
Harvesting of samples to carry out bacteriological
analysis of the water. 5.
Transaction of the Concession of the well
before the governmental instances. Note: If outside necessary to use additional materials like protection pipe, one will communicate to him to the client for its approval and will be received by aside. If outside necessary to perforate more of the 30 meters, the additional meters will be received, equal as if it go to the inverse one, pays solely the perforated meters. |